Kerry-ITS

World Wide Branches

Thailand, Laem Chabang

KERRY-ITS (THAILAND) LTD / บริษัท เคอรี่-ไอทีเอส (ประเทศไทย) จำกัด

After the merger with Kerry Logistics in Year 2009, Thailand was the first depot in our expansion plan - officially opened in February 2010.

Headed by our professional team from our Regional Head Office, we were able to install the high performance Automatic Cleaning System and the upgraded Bio-Reactor Waste Treatment System with NanoFiltration and Reverse Osmosis.

Located at only 8km away from the port and just beside Kerry Siam Seaport, the depot will serve as an interchange for the cleaning and maintenance services for your tanks.


After Singapore's Regional Head Office received the accreditation by @TCO on 8 Nov 2011, Kerry-ITS (Thailand) was the second depot to be audited. The audit was conducted on 30 Dec 2011.

In order to adhere to world-class depot standards, Kerry-ITS (Thailand) Ltd., located in Laem Chabang of Thailand, joined its Regional Head Office in it's audit, passing the scheme successfully. The second @TCO accreditation plaque of an Approved Cleaning Station and Depot was presented to Mr. Francis Loh, Regional Technical and Operations Director of Kerry-ITS Holdings, by Mr. Mike Broadhurst, Vice-President of TAL International and one of @TCO's directors on 13 Feb 2012.

DEPOT FACILITIES
Facility Description Laem Chabang
Area Total area of ___sqm. 10,500
Storage Capacity Able to store ___TEUs. 800
Flooring Concrete flooring with ___mm thickness. 300
Location Located ___km away from the port.

8 (Laem Chabang)

1 (Kerry Siam Seaport)

Security Full fenced with external lights & 24 hours surveillance CCTV system.
Personnel (Manpower) Total employees including of Management, HR, Admin, Finance, Accounts, Legal, Marketing, Operations, etc. 22
Cleaning Bays Quantity of cleaning bays at the cleaning depot. 8
Lifting / Handling Equipments 9-height double-lift empty stacker 1
7-height single-lift empty stacker 1
3-ton forklift (for IBC) 1
Repair Capabilities In-service repair (minor & major), Offhire repair, Interior polishing/grinding/infill & reweld, Structural repair, Modification
Refurbishment
Steam Heating
Appointed Testing Inspecting Authorities First appointed surveyor for periodical testing certification - 5yrs hydrotest or 2.5yrs airtest GL (ICSB)
Appointed Cleanliness Inspecting Authorities First appointed surveyor for cleanliness inspection ICSB
Cleaning & Treatment System Fully automated cleaning & bio-reactor waste treatment system with touch-screen PLC for proper cleaning water residue disposal. Waste settlement is put into filter press and the cake sludge is sent for incineration.
Operating Standard ITCO ACC standard or customers’ requirements. Tank Activity Report is sent to customers on daily/weekly basis. EIR/repair estimate is generated by in-house IDMS system.
Safety Measures Total of ___ safety warnings signage such as No Smoking, Flammable Materials, Speed Limit, Goggles, etc. 35

*Figures are updated on quarterly basis. Latest updated on 1 November 2016.